How does it work in the City of St. Louis?
| Item | City of St. Louis |
|---|---|
| Name | Housing Conservation inspection, leading to a Certificate of Inspection |
| Where | The entire City is in a Housing Conservation District |
| When required | Before a vacant home is occupied, and before the sale of an occupied home with no certificate in the last 12 months |
| Fee | $120 vacant unit, $200 occupied dwelling without a current certificate (as posted November 2026) |
| Scheduling | Booked with the application, between 3 business days and 15 days out. Water and electric must be on |
| If it fails | The owner has 30 days to make repairs, with possible extensions |
| Valid for | 12 months |
How does it work in St. Louis County?
- Unincorporated County. The County’s Department of Public Works does a re-occupancy inspection, and the new occupants are named on the occupancy permit.
- Municipalities. Many of the County’s municipalities have their own occupancy inspection and fee. Some use County inspectors, some use their own. A few have none. Always check with the city hall for the address, not the mailing city.
- Timing. The County has said waits can reach four to six weeks in spring. After the first inspection the owner has 90 days to finish repairs.
- St. Charles County. Rules differ again by city. Check with the municipality.
Who orders it, and who pays for repairs?
Local rules say who must apply. The sale contract says who pays for required repairs, and that is negotiated like anything else. On my listings I order the inspection when we list, so the repair list is known before a buyer is involved and there is no surprise three weeks before closing.
What do inspectors usually flag?
These are the common items on older St. Louis houses: missing smoke detectors, missing handrails, ungrounded or open electrical, peeling paint, broken window glass, missing anti-tip brackets and water heater relief piping. Most are small. A few, like an electrical panel or a failing retaining wall, are not.
What should a first-time buyer do?
- Ask whether the municipality requires an occupancy inspection before you write the offer.
- Put in the offer who is responsible for passing it.
- Still order your own inspection, including a sewer lateral camera on an older house.
- Apply for the occupancy permit in your name as soon as the municipality allows it.
What is the next step?
Text me the address at (314) 348-5331 and I will tell you which office handles it and what they ask for. I reply within 24 hours.